Wellness hotel with holiday homes – Itterbeck (DE)

Redevelopment of an existing hospitality site (Itterbeck, DE) into a coherent plan with a hotel, wellness facilities and holiday homes. The project is in the execution phase and will open its doors in mid-2028.

Wellness hotel with holiday homes – Itterbeck (DE) — main photo

At the Am Sportplatz site in Itterbeck, Germany, an existing hospitality venue is being renewed and extended with a hotel, wellness facilities and holiday homes.

For the plan, an amendment to the zoning plan (B-Plan) was carried out and managed. The project is currently in the execution phase, in which the interior plan is being developed alongside purchasing and tendering with construction partner BrightBuildingBouwgroep from Vroomshoop.

Redevelopment plans? Get in touch!

Preliminary research

The existing buildings were inventoried and assessed for their redevelopment potential. On that basis, a proposal was made for which parts of the building to retain and which to demolish.

Concept development

The choice was made to demolish back to the core of the original first construction period, consisting of the two houses with their connecting link, plus a new entrance to be built that connects to the sports fields. The building used to serve as changing rooms and canteen for the neighbouring football club. The function hall complex and the bowling alley (Bundeskegelbahn) will be demolished.

In their place comes a two-storey building with a green roof that will house the hotel and wellness section. Holiday homes will be placed in the large surrounding garden with its fine row of trees.

The plan was visualised at an early stage and presented to the local community at a presentation to the municipality and stakeholders. The response was enthusiastic, and the plans were allowed to proceed towards an amendment to the zoning plan (B-Plan).

Design

The design is made nature-inclusive through green roofs, nesting boxes, a garden design with a water buffer and the retention of the existing greenery and trees. The roofs have overhangs to protect the timber trusses and timber facades from the weather, and provide passive solar shading in summer. On the ground floor, this shading is provided by large sliding doors that suit the barn typology chosen for the hotel's main volume. All of this is integrated into the so-called GEG Nachweis concept within the German building permit system in the federal state of Lower Saxony (Niedersachsen).

A broad target group has also been taken into account: families and older guests can use specially designed family rooms that are also wheelchair-friendly. This applies both to the hotel and to the specially developed holiday homes.

Next to the hotel, a wellness area has been designed with a stainless steel swimming pool and sauna. The facade of this section can be opened fully in summer, creating an outdoor feeling connected to the sunbathing lawn.

Where suitable, roofs are fitted with PV panels. The all-electric project is further supplied with power from a nearby agricultural complex with a large installed PV capacity on the roofs of its stables, and is therefore self-sufficient.

Technical design

Together with a design team consisting of the lead structural engineer, geotechnical consultant, building services consultant, spatial planning consultant, fire safety consultant, ecologist, energy consultant, commercial kitchen supplier, swimming pool supplier and architect, an integrated plan was developed. The combination of existing building and new build made the design particularly challenging and complex.

Construction techniques applied

  • optimal facade and roof insulation where possible
  • insulated interior wall linings and reveal insulation at window frames in the existing building
  • new window frames with triple glazing and modern draught sealing
  • mechanical ventilation system with heat recovery
  • heat pump system
  • low-temperature underfloor heating
  • appropriate solar shading
  • green roofs and rainwater collection on site
  • all-electric building with its own PV solar panels and EV charging points
Execution

Construction is being carried out by BrightBuilding Bouwgroep from Vroomshoop, with support from our office on German laws and regulations and the obligations arising from the permit.

Construction is scheduled to start in December 2026, with completion forecast for spring 2028.

Wellness hotel with holiday homes – Itterbeck (DE) — photo 1
Wellness hotel with holiday homes – Itterbeck (DE) — photo 2
Wellness hotel with holiday homes – Itterbeck (DE) — photo 3
Wellness hotel with holiday homes – Itterbeck (DE) — photo 4
Wellness hotel with holiday homes – Itterbeck (DE) — photo 5

Project overview